MYRICK GUROSKY + ASSOCIATES

Calvary Baptist

Tuscaloosa, AL – Calvary Baptist Church partnered with MG+A to complete the master planning process and identify a phasing approach to modernize the campus.  Phase 1 was recently completed which included a major renovation to Calvary’s historic sanctuary.  A key part of this project was a renovation to the stage and back wall to provide more flexibility for setup and multiple worship styles.  The existing set of large organ pipes was moved towards that outer walls to provide space for a significantly larger center screen.  Architectural lighting and new projection provided major upgrades to their capabilities.  A new side baptistery was also constructed to replace the existing one located above the choir loft.  Phase 2 design is currently underway