Lafayette, LA – Phase 1 of the master plan to redevelop the existing campus was completed in 2008. Phase 1 included the demolition of two older buildings that were replaced with a new facility to accommodate newborns up to youth. This facility connected to the existing sanctuary and circulation corridor with the first phase of the commons area. Completed in 2015, Phase 2 included demolition of an older facility, extension of the commons area and connection to a new two story Education facility as well as a large multi-use Fellowship Facility with a 500 seat capacity at round tables.