FBC Lafayette

  • In 2008, a master plan to redevelop the existing campus was completed.
  • Phase 1 included the demolition of two older buildings that were replaced with a new two story facility to accommodate newborns up to youth.  The new facility was connected to the existing sanctuary and circulation corridor with the first phase of the commons area.
  • Completed in 2015, Phase 2 included demolition of an older facility, extension of the commons area and connection to a new two story Education facility as well as a large multi-use Fellowship Facility with a 500 seat capacity at round tables.